Tuckersmarsh

Tuckersmarsh

Overview A masonry culvert running over an embankment approx. 90m long & only 600mm dia required pointing and a new invert to improve its structural integrity.

7
Permalink Gallery

New Bridge

New Bridge

Overview New Bridge is a narrow, listed structure on Dartmoor. Over time, the granite copings had been knocked off the parapet wall into the River Dart.

Weir Quay

Overview A cliff slip had threatened a busy road in and out of Weir Quay, a small enclave on the Bere Peninsula, Devon. Our task was to stabilise the existing cliff and build a masonry retaining wall backfilled with reinforced concrete.

Belmont Park

Overview Belmont Park is a large and popular location in Exeter offering a huge array of outdoor activities for all ages. Within the park, a large retaining wall and the parapet handrail system had failed, forcing the closure of a pedestrian path.

Bridge Road

Overview Works to Bridge Road, located in Exeter, Devon are currently underway to improve future congestion. Works include the widening of the existing carriageway and bridges to provide four lanes.

1
Permalink Gallery

Barwynds Retaining Wall

Barwynds Retaining Wall

Overview An existing masonry wall retaining a busy road leading to Illfracombe, Devon had collapsed over a tract spanning 27m in length.

WhatsApp Image 2016-08-17 at 08.53.45
Permalink Gallery

Hampstead Heath – BAM Nuttall

Hampstead Heath – BAM Nuttall

Project Description
Overview
Marine Civil Solutions were asked by BAM to provide assistance to remove multiple temporary works steel piles from the swimming lakes on Hampstead Heath, London. MCS provided a site specific Diving Project Plan […]

WhatsApp-Image-20160727-98
Permalink Gallery

Thames Valley Weir Regeneration – Jacksons Civils

Thames Valley Weir Regeneration – Jacksons Civils

Overview
As part of a £3million regeneration project to weir gates throughout the Thames valley, Jacksons Civils asked Marine Civil Solutions to support them with the temporary works required to provide a safe and dry […]

Umberleigh Failed bank stabilisation
Permalink Umberleigh Failed bank stabilisationGallery

Umberleigh

Umberleigh

Overview
Marine and Civil solutions were asked to stabilise a failed bank that was approximately 12 meters wide and 10 meters high.
Challenges
The existing bank was retaining a main road and due to the slip, the […]

Works Carried out by Marine Civil Solutions on Shoalstone Salt Water Pool
Permalink Gallery

Shoalstone Saltwater Pool

Shoalstone Saltwater Pool

Overview
The Salt water pool and its base at Shoalstone had deteriorated over many years and had become unusable to operate for the summer.

Marine Civil Solutions were brought in to install a new 150mm DIA […]